<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <font size="-1">All,<br>
      <br>
      As of this morning, the remaining hydrants on Shrewsbury Street
      (between the Holden & Chapel Intersection and Main street)
      have been activated.   The temporary hydrants have been bagged and
      the new hydrants were unbagged. Keep in mind there are hydrants in
      some new locations, but I don't believe any of the existing
      locations changed, we just added a couple more.  <br>
    </font><br>
    <font size="-1"><font size="-1">This means all Shrewsbury Street
        hydrants are now live.<br>
        <br>
        Let me know if you have any questions.</font></font>
    <pre class="moz-signature" cols="72">-- 
Ryan S. Mouradian, P.E.
Water and Sewer Superintendent 
Holden Department of Public Works
1196 Main Street
Holden, MA 01520
Phone: (508) 210-5550
Fax:   (508) 829-0252
<a class="moz-txt-link-abbreviated" href="mailto:rmouradian@holdenma.gov">rmouradian@holdenma.gov</a></pre>
  </body>
</html>